Requirements
ATE-200 operability check is carried out by means of self-control.
The program allows carrying out of ATE-200 hardware in general and its separate elements self-control:
-
Test of commutative matrix relay;
-
Instruments test;
-
I/O Card.
ATE-200 self-control can be carried out on 2 levels:
-
Operability check – short test performed in the beginning of test procedure of each unit under test;
-
Comprehensive control is performed by means of specialized AI set for ATE-200 devices fault detection.
Example of ATE-200 location
The size of the laboratory for testing of 120 various types of aircraft units with ATE-200 is represented on the figure. The Capacity – 15 – 50 units per day.

Required level of special training
For the work with ATE-200 maintenance personnel must complete training program ATE-200 maintenance and also must learn safety instructions for electric equipment operation.
Basic data for test programs development
The following documentation is basic data for NTP and AI development:
-
HK in compliance with 19338-82 GOST;
-
Operations manual;
-
Specifications;
-
Unit under test manual, presented by a designer of unit under test (for instance, incoming check manual) and approved by BETA AIR;
-
Unit under test manual designed by BETA AIR JSC and conformed with Unit under test designer;
-
Component Maintenance Manual (CMM) – maintenance manual and/or program written on a special machine language;
-
Operation cards for unit under test checking.
|
|
|
|